We reached another major milestone yesterday... we finished glassing the exterior of the hull. Now were on to the long task of fairing and sanding. Based on our current pace, I expect this to take about three months.
Read More..
Tampilkan postingan dengan label regularly. Tampilkan semua postingan
Tampilkan postingan dengan label regularly. Tampilkan semua postingan
Selasa, 18 Oktober 2016
Kamis, 22 September 2016
Posted by dogger on 03.57
with No comments so far
We laid some more glass yesterday, but Im going to digress a bit.
You may remember in an earlier post that we had a couple of spots where the fiberglass didnt adhere to the plywood. Our initial plan was to drill small holes in these areas and fill them with epoxy. Greg changed his mind. Instead, he cut out these areas with a knife, and filled it with a mixture of epoxy and fiberglass filler. My camera batteries were dead, so I dont have any pics of this, but I will attempt to get some pics posted soon.
After the fiberglass filling, we did a little last-minute sanding, and laid fiberglass on one side. Weve now got about two-thirds of the exterior completely fiberglassed. We still have one side, and both transoms to do, but that should go relatively quick. Of course Ill post pictures.
Read More..
You may remember in an earlier post that we had a couple of spots where the fiberglass didnt adhere to the plywood. Our initial plan was to drill small holes in these areas and fill them with epoxy. Greg changed his mind. Instead, he cut out these areas with a knife, and filled it with a mixture of epoxy and fiberglass filler. My camera batteries were dead, so I dont have any pics of this, but I will attempt to get some pics posted soon.
After the fiberglass filling, we did a little last-minute sanding, and laid fiberglass on one side. Weve now got about two-thirds of the exterior completely fiberglassed. We still have one side, and both transoms to do, but that should go relatively quick. Of course Ill post pictures.
Rabu, 03 Agustus 2016
Posted by dogger on 23.37
with No comments so far
Shower Repair 8
Originally uploaded by OzzyC.
The patch job still isnt re-grouted and re-sealed, but thatll come in the next couple of days. And of course, its not perfect, but its designed to be a semi-permanent patch job, not a total reworking.
Langganan:
Postingan (Atom)